Phone

01708 331876

Email

metal@gtecmetal.com

Address

Manor Farm, Noak Hill Road, Romford RM3 7LS

Open front spray booths

The spray booththat bolts together.

Modular extraction chambers from 2 m to 6 m, designed and manufactured in the UK. Delivered on a pallet, assembled on site.

From £4,048.95 + VAT

GTEC open front spray booth in galvanised steel

Here's how it goes together.

Scroll
Fully assembled GTEC open front spray booth
Step 1

Galvanised panels.

Back and side panels bolt together with fixing angles. No welding.

Step 2

The filter face.

Three mesh filter panels. The centre one lifts out for filter changes.

Step 3

A stiffened roof.

Squares up the chamber and carries the fan.

Step 4

The fan drops in.

Top or rear outlet. Twin fans from 5 m wide.

Done

Seal. Fit filters. Connect.

13 & 17 mm spannersFixings suppliedStep-by-step guide
Five widths
2m

From a compact 2 m bay to a 6 m production booth. Size it for your largest workpiece.

Twin extraction fans from 5 m
2 m3 m4 m5 m6 m
GTEC open front spray booth, 2 m wideGTEC open front spray booth, 3 m wideGTEC open front spray booth, 4 m wideGTEC open front spray booth, 5 m wideGTEC open front spray booth, 6 m wide
2 m wide
Forward canopy
1m

Extend the spray zone forward. A deeper canopy extends the controlled airflow zone, for larger parts and higher volumes.

Open, or a 1, 2, 3 or 4 m canopy
4 m booth with a 1 m forward canopy4 m booth with a 2 m forward canopy4 m booth with a 3 m forward canopy
How it works

Overspray in. Clean air out.

The fan draws air through the open front. Overspray is caught at the filter face, and clean air leaves through the duct.

3Clean air out 3Clean air out 1Air and overspray drawn in 2Caught at the filter face Canopy (open front) Chamber
  1. 1Air and overspray drawn in
  2. 2Caught at the filter face
  3. 3Clean air out through the fan

Vertical discharge: best when your duct runs up through a roof space.

GTEC open front spray booth, 3 m, no canopy
Pricing

Find your booth.

Chamber width
Canopy depth
Fan position
£4,319.39+ VAT
Chamber price, excluding VAT. Fan control, ducting, filters and accessories are added in the configurator.
Continue to configurator → Questions? spraybooths@gtecmetal.com
Bespoke

Need something bigger? Enclosed booths, built to order.

Alongside our modular range, we design, manufacture and install fully enclosed spray booths around your building and your process.

Talk to our team →
About us

Crafting Metal Excellence Since 1988

35+ years
of metal fabrication

GTEC Metal Fabrication Limited, established in 1988 and based in Romford, Essex, brings over 35 years of experience in high-quality metal fabrication and manufacturing.

We provide a comprehensive range of metal fabrication services, from one-off bespoke projects through to repeat production. Combining skilled craftsmanship with modern manufacturing technology, we work closely with our customers to deliver high-quality, reliable solutions tailored to their requirements.

Contact Us →
Services

What We Do?

Bespoke Metal Fabrication

From one-off bespoke components to repeat production, we provide a comprehensive range of metal fabrication services. Our capabilities include laser cutting, CNC punching, folding, forming and a range of finishing options, allowing us to manufacture high-quality components and assemblies to suit your requirements.

Laser cuttingCNC punchingFoldingFormingFinishing
Explore More →
GTEC fabricator welding a steel assembly
Testimonials

What Clients Say About Us

★★★★★
We have partnered with GTEC many times over the last 8 years for bespoke and structural metalwork requirements. Mark and his team provide expert assistance in the resolution of technical challenges and produce a high-quality product that we are proud to install.
Pantera Group logoJack DaviesPantera Group
★★★★★
Mark at Gtec Metal Fabrication consistently dedicates time to thoroughly review our designs, which are often highly bespoke and unconventional. He is always willing to meet in person to discuss and refine the details.
Group Metropolitan logoBradley BurtonGroup Metropolitan
★★★★★
GTEC was absolutely instrumental to the overall success of our simulator project. Their engineering knowledge and design capabilities allowed us to share 3D models without worrying about fitment or finish issues during final assembly. The end result is a system that works as designed and has been 100% reliable.
CAVE Oy logoAndy SymondsCAVE Oy

CONTACT

Get in Touch

Have a project you’d like to discuss or need advice on your requirements? Get in touch with our team to discuss how GTEC can support your project, from one-off bespoke fabrication through to repeat production.